Share |

Question

Status:Closed    Asked:Apr 22, 2013 - 07:38 AM

Test the whole unitized load or the single packaged-product?

Our products are transported as a unitized load on a pallet.

If I choose 3E to test a unitized load, do I need to test the single packaged-product of the unitized load as well?

 
Do you have the same question? Follow this Question
 

Answers

ISTA Test Procedure 3E is intended to be performed on a unitized load as a whole. If your packaged-product is only transported as unitized loads to its final destination then testing a single packaged-product from your unitized load might not be necessary. If your unitized load is broken down and packaged-products are distributed individually at any point then testing a single packaged-product from the unitized load to the appropriate procedure is recommended.

 

Apr 22, 2013 - 07:38 AM

0
0
Report it

OTHER QUESTIONS NEEDING ANSWERS

ISTA test for unitized load of same product with slip sheet ...
What's best ISTA Method for Evaluating Slipsheet Performance...
Login   |   Register